• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Health
  • Opinion
  • Sports
  • More…
    • About
    • Privacy Policy
    • Advertise
Sunday, April 19, 2026
  • Login
No Result
View All Result
NEWSLETTER
Elanza News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Health
  • Opinion
  • Sports
  • More…
    • About
    • Privacy Policy
    • Advertise
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Health
  • Opinion
  • Sports
  • More…
    • About
    • Privacy Policy
    • Advertise
No Result
View All Result
Elanza News
Home National

FG partially shuts Third Mainland Bridge for 8 weeks repair

Ojimaojo Abubakar by Ojimaojo Abubakar
January 10, 2024
in National, News
0
FG partially shuts Third Mainland Bridge for 8 weeks repair
0
SHARES
19
VIEWS
FacebookTwitterWhatsappEmailTelegram
The Federal Government on Tuesday partially shut the Iyana Oworonshoki-Adeniji Adele section of the Third Mainland Bridge, to begin comprehensive rehabilitation works on the bridge.

The News Agency of Nigeria (NAN) reports that the Federal Controller of Works, Lagos State, Mrs Olukorede Kesha, supervised the closure to mark the beginning of the rehabilitation.

The closure was done at the intersection where motorists coming from Ojota link the Third Mainland Bridge on the Island-bound carriageway.

RelatedPosts

Nwonyo 2026: Culture, Commerce, and Unity Collide in Taraba

Food Crisis: Expert Tells FG to Scale Up Organic Fertiliser, Moringa Production

Abacha Remains Misunderstood Patriot, Says Dantata

Kesha was accompanied by the Sector Commander, Federal Road Safety Corps, Mr Kayode Farinloye; the Commissioner for Transportation, Oluwaseun Osiyemi; Commissioner of Police, Fayoade Adekoya, and other top officials.

She said the closure of the bridge would be done in two phases daily and traffic diverted to different carriageways at different times.

This, she said, was to give motorists opportunity to use the bridge while the rehabilitation works continued.

She explained that the Mainland in-bound Lagos Island lane would be open from 12.00 a.m. to noon, while those who intend to come from the Island to the Mainland will use Eko Bridge.

She added that from 12.00 p.m. to midnight, motorists would be able to access the bridge from the Island to the Mainland, while motorists from the Mainland heading towards the Island would have to use Eko or Carter Bridge.

Kesha said the rehabilitation works, which will include replacement of some expansion joints and total replacement of asphalt, would last between six to eight weeks.

ALSO READ:  Wigwe: NSIB collaborates NTSB to investigate helicopter crash

She said the closure was part of the ongoing work that started in November, 2023, focusing on fixing the ramps, and some repairs on the remaining parts of the bridge, including the underdeck and lagoon sections.

“Motorists from Iyana Oworo, Toll Gate, Ogudu or Ibadan can no longer use this axis (Island Bound carriageway) so they will have to go through Gbagada, Anthony-Ikorodu-Road-Western-Avenue, Funsho Williams to Carter Bridge or Eko Bridge going forward but this is going to be a daily thing.

“So, in the morning, they have the access from 12 midnight to 12 noon the next day while in the afternoon, the Adeniji to Iyana Oworo bound have the free access from 1.00 p.m. thereabout till 12 midnight,” she said.

The controller said measures were in place, including radio jingles, to ensure motorists understand diversion points, to ensure seamless movement.

She said adequate road signs would be added around detour points at Ojota and Oworonshoki in addition to traffic managers’ deployment to reduce challenges of road users.

Keisha said that the scope of work would include complete removal and replacement of the asphalt of the deck to the standard two inches to make motoring smoother and safer on the bridge.

She said carefully chosen competent contractors on the project were going to work round the clock for speedy completion of the top deck work on the bridge.

“There will be 24 hours construction here, that is why it is fast-tracked to eight weeks,” the controller said.

She said that the Minister for Works, Mr David Umahi, was going to flag off rehabilitation works under the bridge at the weekend, so that simultaneously work would take place both on lagoon sections and the top deck.

ALSO READ:  FG lifts ban on mining to boost Zamfara IGR – Matawalle

Keisha expressed confidence that there would be seamless traffic flow and management because of the collaboration with the traffic and law enforcement heads who would be physically present.

She appealed to motorists to obey traffic rules and use alternative routes to prevent hardship as comprehensive repairs continued on the highway.

Osiyemi, on his part, expressed satisfaction with the collaboration between the state and federal government.

He said that 250 Lagos State Traffic Management Authority (LASTMA) personnel would be deployed to work with road safety officials on the project.

Also, the state Commissioner of Police promised top notch security for the project, while his FRSC counterpart promised to ensure all exits and links to the bridge were properly manned.

Previous Post

Pipeline Surveillance: Group Warns Sponsors of False Allegations Against PINL To Desist

Next Post

Tunji-Ojo Visits Aso Rock Amid N438m Contract Controversy

Ojimaojo Abubakar

Ojimaojo Abubakar

Abubakar Ojimaojo is a graduate of Mass Communication, political and football analyst currently work at elanzanews.ng as Editor. He pride himself as skilled wordsmith with a passion for delving into contemporary political issues on both national and international scale.

Related Posts

Nwonyo 2026: Culture, Commerce, and Unity Collide in Taraba

Nwonyo 2026: Culture, Commerce, and Unity Collide in Taraba

by Nathaniel Irobi
April 19, 2026
0

The ancient fishing community of Ibi witnessed a historic convergence of culture, diplomacy, and enterprise as the 2026 Nwonyo International...

Food Crisis: Expert Tells FG to Scale Up Organic Fertiliser, Moringa Production

Food Crisis: Expert Tells FG to Scale Up Organic Fertiliser, Moringa Production

by Nathaniel Irobi
April 19, 2026
0

Dr. Ashimashiga Michael Akoloaga, founder and chairman of Eden Moringa Productions and Marketers Limited, has called on the Federal Government...

Abacha Remains Misunderstood Patriot, Says Dantata

Abacha Remains Misunderstood Patriot, Says Dantata

by Elanza
April 19, 2026
0

A media aide, Salihu Dantata Mahmud, has defended the legacy of late Head of State, Sani Abacha, describing him as...

Next Post
Tunji-Ojo Visits Aso Rock Amid N438m Contract Controversy

Tunji-Ojo Visits Aso Rock Amid N438m Contract Controversy

FUT Minna Disowns Fake Professors

FUT Minna Disowns Fake Professors

Recommended

Bird Strike Grounds United Nigeria Airlines 

Bird Strike Grounds United Nigeria Airlines 

4 days ago
Gunmen Abduct UTME Candidates in Benue

Gunmen Abduct UTME Candidates in Benue

3 days ago

Popular News

  • Residents flee as flood ravages 10 communities in Kebbi – NEMA

    Residents flee as flood ravages 10 communities in Kebbi – NEMA

    0 shares
    Share 0 Tweet 0
  • Urban Smart Farming Initiative Targets 10 Million Yams for Nigeria

    0 shares
    Share 0 Tweet 0
  • Arewa youths demand immortalisation of late Sharia court registrar Musa

    0 shares
    Share 0 Tweet 0
  • BREAKING: ICPC Rearrests El-Rufai, Returns Him to Custody

    0 shares
    Share 0 Tweet 0
  • Speaker Abbas’ Aide, Gaiya, Defects to ADC, Declares Kaduna-South Senate Ambition

    0 shares
    Share 0 Tweet 0

Connect with us

Facebook Instagram Twitter Youtube
Elanza logo

Elanza News is your NO 1 online platform for all news update.
#SayNoToFakeNews
Contact Us

Category

  • Arts & Literature (25)
  • Business (828)
  • Education (270)
  • Entertainment (358)
  • Health (244)
  • National (3,261)
  • News (10,114)
  • Opinion (426)
  • Politics (2,063)
  • Science (15)
  • Security (419)
  • Sports (681)

Newsletter

© 2023 Elanza News - The No 1 online news platform

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • Business
  • Science
  • National
  • Entertainment
  • Sports
  • Health

© 2023 Elanza News - The No 1 online news platform