• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Health
  • Opinion
  • Sports
  • More…
    • About
    • Privacy Policy
    • Advertise
Monday, March 9, 2026
  • Login
No Result
View All Result
NEWSLETTER
Elanza News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Health
  • Opinion
  • Sports
  • More…
    • About
    • Privacy Policy
    • Advertise
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Health
  • Opinion
  • Sports
  • More…
    • About
    • Privacy Policy
    • Advertise
No Result
View All Result
Elanza News
Home News

Abuja-Kaduna-Kano road ‘ll be ready in 14 months – Minister

Nathaniel Irobi by Nathaniel Irobi
January 17, 2025
in News
0
Abuja-Kaduna-Kano road ‘ll be ready in 14 months – Minister
0
SHARES
11
VIEWS
FacebookTwitterWhatsappEmailTelegram

The Minister of Information and National Orientation, Alhaji Mohammed Idris, says the Abuja-Kaduna-Kano dual carriage way will be ready for use in 14 months.

Idris made this known at the inauguration of the rehabilitation of section 1 of the road (Abuja to Kaduna) rigid pavement on Thursday.

RelatedPosts

Gov Fintiri Imposes 24-Hour Curfew on Lamurde LGA Amid Renewed Violence

Court of Appeal Affirms Ex-Army General’s Conviction, Orders N4bn Restitution

IWD 2026: Invest in Women to Unlock Nigeria’s Future, Orelope-Adefulire Urges

The News Agency of Nigeria (NAN) reports that while Section 1 of road is from Abuja to Kaduna, Section 2 is from Kaduna to Zaria, and Section 3 is from Zaria to Kano.

The description and scope of works include, scarification and pulverization of existing bituminous surface as sub-base material and filling of embankments.

Others are provision of approved crushed rock material (wet or dry) to 100mm thickness with three per cent stabilisation in shoulders and carriageway, reinforced concrete lined drains and other hydraulic structures where necessary.

Similarly, other description and scope of works are provision of median barriers and median drains where necessary, and provision of CRCP 200mm thick on carriageway and shoulders.

Idris said that the Minister of Works, Mr David Umahi, had explained extensively and put the politics of the road to rest.

“President Bola Tinubu is very committed and determined to to ensure that this road from Abuja to Kano is completed in record time of 14 months.

“This is the reason the government cancelled the road contract with the former contractor who said it would complete the road in three years and the government refused and insisted on 14 months.

ALSO READ:  Reps panel summons Discos, Gencos over failure to perform social responsibility

“That is also why it was broken into three segments for ease of construction. Nigerians, especially those plying this road, are anxious to see that the road is completed, ” he said.

He said that delay of any kind would not be accepted.

“The President has given a matching order, and the National Assembly is also given them the necessary cooperation and there will be no issues.

“Within 14 months, we are going to have a brand new road from Abuja end to Kano,” Idris said.

Meanwhile, Umahi explained that there was an extension of the road to Aminu Kano International Airport and another five kilometre extension on the Abuja-Lokoja end of the road.

According to Umahi, Section 1 of the road starts at Zuba Junction, Zuba Interchange and terminates at Kaduna Western Bypass in Kaduna.

He said that the road, which will have have solar lights would last between 50 and 100 years.

“Note that the existing pavement between Abuja to Kaduna has undergone different levels of deterioration over the years.

“This has caused failure due to alligator cracks, corrugation, shoving, underground pumping, rutting, raveling, potholes and poor drainage.

“The ministry quickly intervened by commencing emergency repairs on this stretch in order to ameliorate the suffering of the road users.

“The maintenance work is in progress in four different stretches simultaneously in order to fast track the repair works,” Umahi said.

NAN reports that dignitaries at the inauguration of the rehabilitation of the road ininclud Chairman, Senate Committee on Works, Sen. Mpigi Barinada, Vice Chairman, Senate Committee on Tourism, Sen. Anthony Ani, among others. (NAN)

ALSO READ:  Supreme Court reserves judgment in FG’s suit against LGs
Previous Post

WHO seeks $1.5bn to tackle global health challenges in 2025

Next Post

Dangote Cement, FBN Holdings, others lift equity market by N53bn

Nathaniel Irobi

Nathaniel Irobi

Related Posts

Gov Fintiri Imposes 24-Hour Curfew on Lamurde LGA Amid Renewed Violence

Gov Fintiri Imposes 24-Hour Curfew on Lamurde LGA Amid Renewed Violence

by Nathaniel Irobi
March 9, 2026
0

  In a decisive move to stem escalating tensions, Adamawa State Governor Ahmadu Fintiri has imposed a 24-hour curfew on...

Court of Appeal Affirms Ex-Army General’s Conviction, Orders N4bn Restitution

Court of Appeal Affirms Ex-Army General’s Conviction, Orders N4bn Restitution

by Nathaniel Irobi
March 9, 2026
0

The Court of Appeal has upheld the conviction and sentencing of former Group Managing Director of Nigerian Army Properties Limited,...

IWD 2026: Invest in Women to Unlock Nigeria’s Future, Orelope-Adefulire Urges

IWD 2026: Invest in Women to Unlock Nigeria’s Future, Orelope-Adefulire Urges

by Nathaniel Irobi
March 9, 2026
0

  In a powerful message to mark International Women’s Day 2026, Princess Adejoke Orelope-Adefulire, the Senior Special Assistant to the...

Next Post

Dangote Cement, FBN Holdings, others lift equity market by N53bn

Diallo’s hat-trick rescues Manchester United against Southampton

Recommended

IWD 2026: Invest in Women to Unlock Nigeria’s Future, Orelope-Adefulire Urges

IWD 2026: Invest in Women to Unlock Nigeria’s Future, Orelope-Adefulire Urges

9 hours ago
Son Claims ICPC Using Former Governor’s Silence as Weapon

Datti-Ahmed Issues FG Ultimatum Over El-Rufai’s Detentio

10 hours ago

Popular News

  • AIG Tunji Disu Appointed as New IGP

    AIG Tunji Disu Appointed as New IGP

    0 shares
    Share 0 Tweet 0
  • Appeal for Tax Relief for Nigeria’s Paramilitary Agencies

    0 shares
    Share 0 Tweet 0
  • IWD 2026: Kaduna’s Sole Female Council Chair Champions Gender Equality

    0 shares
    Share 0 Tweet 0
  • Nasir el-Rufai as a Threat to National Security by Chief Femi Fani-Kayode

    0 shares
    Share 0 Tweet 0
  • The Need To Scrap FRSC In Nigeria

    0 shares
    Share 0 Tweet 0

Connect with us

Facebook Instagram Twitter Youtube
Elanza logo

Elanza News is your NO 1 online platform for all news update.
#SayNoToFakeNews
Contact Us

Category

  • Arts & Literature (25)
  • Business (817)
  • Education (261)
  • Entertainment (346)
  • Health (240)
  • National (3,143)
  • News (9,776)
  • Opinion (413)
  • Politics (1,955)
  • Science (15)
  • Security (413)
  • Sports (633)

Newsletter

© 2023 Elanza News - The No 1 online news platform

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • Business
  • Science
  • National
  • Entertainment
  • Sports
  • Health

© 2023 Elanza News - The No 1 online news platform